We received a consultation from a customer about a machine for tunnel excavation analysis using MIDAS GTS NX.
I would like to make a proposal with a budget of 50 to 70 yen.
When I checked the manufacturer's Web forum about MIDAS GTS NX, it supports parallel processing, but the efficiency of core parallelism is not so high, and even with 4 CPUs, the efficiency is not dramatically improved compared to 1 CPU configuration. Hmm.On top of that, there was a statement on the forum that operations up to 8 cores are supported without problems.Based on this information, we are considering to emphasize the speed of one core rather than the number of cores.
Also, according to the manufacturer Web of MIDAS GTS NX, it supports GPU acceleration, but GPU requires single precision. NVIDIA's double-precision GPU costs more than 100 million yen for a single card, which greatly exceeds your budget.Therefore, the video card in this configuration does not consider double precision calculation and is intended for use as a screen display.
【Main Specifications】
CPU | Ryzen9 5950X (3.40GHz 16 cores) |
memory | 128GB (32GB x 4) |
Storage 1 | 1TB M.2 SSD |
Storage 2 | 4TB HDD S-ATA |
video | NVIDIA Quadro P2200 |
network | on board (10/100 / 1000Base-T x1) |
Housing + power supply | Middle tower case + 850W |
OS | Windows 10 Professional 64bit |
■ Click here for details and inquiries about this PC case |